We provide innovative solutions to expand business

Quality & Safety

QHSE code of practice for sub contractors : It includes motivational scheme as well as reprimands for the sub contractors against the QHSE norms which needs to follows

Other relevant QHSE information : It includes the QHSE parameters against every activity which will be followed at site like

  1. Height work safety
  2. Hot work safety
  3. Working with the tower crane
  4. Electrical safety etc.

A. Staffing : Will deploy the following QHSE personnel at site

  1. Qualified safety manager / engineer.
  2. Other QHSE personnel as per BOCW

B. Labour welfare : Will provide the labour hutment Which includes :

  1. Separate washing, cooking & urinal facility
  2. Canteen facility
  3. Rest shade for workers
  4. Drinking water facility (Quarterly)
Traffic Management

Vehicle trafficking system

  1. Ensure safe traffic movement by distinguishing dedicated corridor for labour and vehicle movement on site.
  2. Ensure safe signalling by deploying traffic marshal
  3. Ensure & implement entry register for all vehicles on site
  4. Specific traffic / road safety training as per the safety standards for all drivers & crew involved
  5. Traffic signage and speed limits provided at all prominent locations.

Working @ height safety
  1. Horizontal permanent net at initial level to arrest the fall.
  2. Provision of vertical net (10’*5’) at active slab area which will cover approx 2+ floors.
  3. Edge barricading by tubular pipes comprises of mid rail & top rail.
  4. Lift shaft barricading by means of steel mesh gate.
  5. Construction floor openings will be covered by steel mesh.
  6. Provision of rope grab fall arrestor while external plaster & any other height work on scaffolding structure.

Gallery

Certification